PEDEN INDUSTRIES

Project: Developing Kevin's Bee Farm

Land Clearing
Site Grading
Backfilling
Tree Falling
Mulching
Brush Cutting
10 acres

We’ve been working with Kevin on this property off and on since 2020. Started with stump removal. Backfilled around 1100 loads of dirt. Lots of grading. Built a rock wall. Built a berm to protect the bees from wind.

after gradingafter gradingafter gradingafter gradingafter gradingafter gradingafter grading

Get a free quote

(604) 341-7374